Architectural
Brands

 
    EXPLORE OUR SITE:

snostop penetrating snow system


Roofers World_ E_Store Button

ARCHITECTURAL Brands:

button_architectural Div.

RW Architectural Division-HOME
     Engineered Product Solutions


SNOSTOP®
     Engineered Snow Fence Solutions


SNOSTOP PLUS™
    Polycarbonate Snow Guards


RNC Anchors®
     Roof Anchor & Fall Arrest Systems


Leaf Defier
   Eavestrough and Gutter Solutions


WHOLESALE Brands:

wholesale roofing tools

RW Wholesale Division-HOME
     Engineered Product Solutions.



Roof Brackets
    Adapt-a™ , Endura™ & Extreme Bracket™


Tear-Off Tools
    Red-Ripper ® & Little Red-Ripper™


Red Ripper®
   The Ultimate Shingle Tear-Off Tool



Little Red-Ripper™
   Handy mini ripper and Demolition Tool


Eternabond
   Microsealant Roof Repair Tapes


Banana Knife
   The Cutting Edge in Roofer's Knives



Snostop Plus™
   Snow Guards with Heat Cable Option



Roof N Tuff®
   Premium Tools for Roofers




Roofers World Social Media Links
facebook button Linked-In Button Wordpress Button Twitter Button Slideshare Button

 

 

 

buton _snostop
SnoStop
Penetrating Installation Guidelines

 

Penetrating System Installation:

Step 1: Bracket Installation

  1. Always predetermine what you are fastening into, and know the substrate can handle the snow loads.
  2. From the quote given determine where the brackets are going to be fastened. Make a chalk line or measure from the eave to the point of securement.
  3. Caulk the base plate of the bracket and place along the chalk line.
  4. Secure the bracket using the screws provided. Pre-drilling metal may be necessary.

Step 2: Tube installation

The tubes install one into the other by sliding the swaged end of the first tube, into the full size, opposite end of the next tube.  Tubes can be easily cut to the appropriate length when needed with a power or hack saw.  At the first bracket in any run, and at the last bracket of the same run a stop pin must be inserted through the tube, on the inside position of the first and last brackets, to prevent the tubes from sliding out of position.  The stop pin is installed by pre-drilling the tubes with a 1/8” drill bit and tab the stop pins, which are provided, into the hole with a hammer

NOTE: For easiest results install several brackets and then tubing and then repeat.  This will help proper alignment at all times and allow for an easier install.


Penetrating Drawings in Adobe PDF Format

Penetrating Drawings in Autocad DWG Format




Architectural Attachment Options in Adobe PDF Format

Architectural Attachment Options In Autocad DWG Format


3 Part CSI Specs in PDF Format

3 Part CSI Specs in MS WORD Format


Disclaimer

 

 

 

 

 

 

 

 

 

 

 
      Copyright 1996-2010 Roofers World .             Toll Free: 1-800- 352-6147 | 2590 Sheffield Road, Ottawa, Ontario. Canada, K1B 3V7

 

 

Google Analytics Alternative